Cadence Expands Contract Medical Manufacturing Facility
The 21,000-square-foot expansion is expected to be completed by next March. An ISO Class 7 cleanroom will be added by the end of 2022.
October 26, 2021
A contract manufacturer serving medical device OEMs, Cadence Inc. announced today the expansion of its Product Realization Center in Cranberry Township, PA. The 21,000-square-foot expansion is expected to be completed by March 2022. An additional ISO Class 7 (10,000) cleanroom is planned for the space by the end of 2022.
Cadence opened a dedicated finished device facility in Pennsylvania in 2013, providing certified cleanroom manufacturing, final assembly, final packaging and labeling, sterilization management, and supply chain management of finished medical devices.
In July 2020, it upgraded the existing cleanroom at the Pennsylvania facility from ISO Class 8 to Class 7. The 2,500-square-foot cleanroom is expandable to 7,500 square feet.
Cadence is headquartered in Staunton, VA, and operates facilities in Connecticut, Pennsylvania, Rhode Island, and Wisconsin. It primarily serves the medical device and aerospace sectors providing services that range from initial product design through manufacturing, supply chain management, and full warehousing and logistics.
About the Author
You May Also Like