This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.
The 10 parameters that design engineers must keep front of mind when designing parts are predicated on one simple method for ensuring perfect molded parts — partnering with your molder.
In this free guide, you'll learn best practices on how to optimize designs for the injection molding process, based on industry knowledge from Fictiv's team of injection molding experts. Fictiv is a leading digital manufacturing company that...
Worldwide demand is growing rapidly for injection-molded medical devices and parts including blood collection tubes, syringes, pipette tips, and more. This guide provides concrete how-to information to help medical device manufacturers select the...
The report covers seven essential trends for the plastics companies today, covering everything from sustainability to 3D printing in prototyping and manufacturing. These trends will continue to drive urgent challenges for plastics materials and...
Bioresins have become an increasingly popular alternative to the traditional petroleum-based resins used in the injection molding process, but pose a number of challenges for molders. It takes the right combination of knowledge, experience and...
The new Heartland Petrochemical Complex, in Alberta, Canada, is only the second PP plant to come online in the last decade, and North America’s first integrated propane dehydrogenated (PDH) polypropylene (PP) facility. Read this white paper for...
Using the wrong O-rings can cause machinery failure in any production facility or laboratory. Machine failure can cause severe accidents and expensive damages. Learning what an O-ring is comprised of is all you need to avoid these dangerous and...
Plant operators face certain common problems with controlling process temperature – including drops in supply water pressure, costly and inefficient maintenance, slow or inaccurate heating or cooling, and difficulties with troubleshooting...